Photovoltaic generation and more

PV generation

Since the 7th of May, our household has been generating some of its own electricity. Given that it’s only another three weeks until the shortest day of the year arrives, we’re achieving better savings than I expected. We have an all electric home (no gas, oil, coal, or wood), so we do consume quite a lot of electricity – 818.8 kW/h in 25 days of May to be precise. We generated 40% of that ourselves from 23 PV panels mounted on the roof.

In the highly deregulated electricity market of Aotearoa New Zealand, there is a considerable difference between the price supply companies sell electricity to consumers and the price they will buy back surplus home generation. Their sell price is typically around four times their buy price. The price differential made it tempting to install storage batteries so that we could call on surplus power when generation was low. But after discussing that option with several installers, we concluded the the return on investment was longer that the estimated life of the current generation of batteries.

Instead, we have installed an “intelligent” inverter that diverts any surplus electricity into the hot water storage system. Instead of maintaining a constant 55°C (131°F) the water is allowed to fluctuate between 40°C (104°F) and 78°C (172°F). Only after the water has reached its maximum temperature does the inverter allow electricity to be exported to the grid. Don’t worry, a regulator ensures that the maximum temperature at the tap (faucet) is no more than 55°C. In effect we’re using the hot water system as a sort of battery. We haven’t needed to use grid electricity to heat the water since the solar power was switched on. Even so that has been a few days where we have exported small quantities of electricity. I expect that in summer we’ll be exporting considerable amounts during the day, and as the heat pump will be switched off, our nighttime use should be minimal.

Covid alternatives to travel

For the most part we Kiwis have been largely unaffected by Covid-19 with the exception of international travel. In our case, it meant the cancellation of an extended holiday in Japan. We’ve concluded that at our age, it’s unlikely that we will feel the urge to undertake the journey once the dangers of the pandemic have passed. Instead we put the funds intended for travel towards solar power. Of course it’s not just a case of having the panels installed. The house, and especially the roof was in need of a repaint, so it made sense to paint the house before the solar panels were installed.

But if we’re going to paint the house, there’s a matter of some repairs that have been on the backburner for a while. The front door for example. Aging had caused fine cracks to develop in some of the wooden panels allowing daylight to be seen through them, not to mention a draft in windy weather. And if the door is to be replaced, why not replace the horrible single-glazed yellow sidelight with something that allows more light into the entrance lobby while reducing heat loss?

To cut a short story shorter, we had a new thermally isolated door and sidelight assembly custom made. The door has a digital lock so that’s one less key I have to worry about. The installers took only two hours to remove the old door and sidelight and install the new assembly. The transformation is quite amazing! Some of the recent changes can be seen in the images below.

The front door – before and after

The front (2 images) and rear (1 image) of the house before the repaint. The rear view clearly shows to state of the roof.

The final result with PV panels installed – 10 on the east facing front, and 13 on the rear facing west. The original paint scheme consisted of eight colours, the new has just four.


Leave a comment

Balmy Summer Days

As we head into late February and temperature climbing above 29°C (84°F), today, my thoughts had turned to enjoying a pleasant relaxed day accompanied by some equally relaxing music. Then the painters arrived.

We’ve contracted painter to give the exterior of the house a total going over – all three storeys. The next few days are going to be constant noise with water blasters and minor repairs taking place before the painting starts in earnest. Not precisely a relaxing atmosphere.

Normally on days like this, the ranchsliders (Kiwi name for aluminium framed glass panel sliding doors) and windows are fully open to allow any breeze to flow through the house keeping temperatures in the comfortable range. Not today. While I might just be able to tolerate the noise (perhaps), the jet and spray from the water blasters are a different matter altogether. So they are all closed for the moment.

Best I can do is suffer the heat – anything over 25°C (77°F) is above my comfort zone, hope that headphones played up loud will drown out the water blaster, and listen to music while pretending to sit under a tree in dappled shade listening to songs such as in the three video clips below. Not sure why, but I’m in the right frame of mind to listen to songs such as these.

Bic Runga – Something Good
Something Good

 Just wanna know ya
 Just wanna talk to ya
 I wanna hear about your day
 I'd never leave ya
 Never be mean to ya
 I'd always let you get your way

 Something good will come our way
 And maybe this good thing's gonna happen today

 If I were honest
 I'd tell you everything
 But it keeps coming out as lies
 Its' not a promise
 In case your wondering
 It's not some blessing in disguise
 
 Something good will come our way
 And maybe this good thing's gonna happen today
 Something good will come our way
 And maybe this good thing's gonna happen today

 I know romance is not in fashion
 And my heart is on the line
 If you would be so kind
 To help me kill some time
 Then something good just might come crashing
 From the stars that light the sky
 If you would be so kind
 To help me kill some time

 Just wanna know ya
 Just wanna talk to ya
 I wanna hear about your day
 I'd never leave ya
 Never be mean to ya
 I'd always let you get your way

 Something good will come our way
 And maybe this good thing's gonna happen today
 Something good will come our way
 And maybe this good thing's gonna happen today
 Something good will come our way
 And maybe this good thing's gonna happen today
 Something good will come our way
 And maybe this good thing's gonna happen today
TEEKS – Remember Me
Remember me

 I wish I had the strength
 To tell you how I feel
 I wish I was brave
 Like the soldier on the battlefield
 See, my heart it races
 Every time you're around
 And I try so hard to speak
 But I can't seem to make a sound
 
 I know that if I walk away
 I'll wonder what you would have said
 And if you felt the same
 But if you don't
 It's okay
 
 I'll be right here waiting if you change your mind
 I don't care how long it takes
 I don't care about my pride
 If it's a thousand years
 Or a thousand more
 I'll be waiting
 And darling all I ask
 Please remember me
 Please remеmber me
 
 I wish I had rhythm
 Maybe I'd ask you to dancе
 I wish I could hold you
 Like my father holds my mother's hand
 
 I know that if I walk away
 I'll wonder what you would have said
 And if you felt the same
 But if you don't
 It's okay
 
 I'll be right here waiting if you change your mind
 I don't care how long it takes
 I don't care about my pride
 If it's a thousand years
 Or a thousand more
 I'll be waiting
 And darling all I ask
 I'll be right here waiting if you change your mind
 I don't care how long it takes
 I don't care about my pride
 If it's a thousand years
 Or a thousand more
 I'll be waiting
 And darling all I ask
 Please remember me
 Please remember me
 Please remember me

 All I ask
 Please remember me
Goldenhorse – Maybe Tomorrow
Maybe Tomorrow

 There's a story I know
 We all leave and let go
 There is nothing to hold us

 In a moment of time
 When the fruit becomes wine
 And the thought becomes the memory

 All of your sorrow
 Maybe tomorrow
 Will fade away in the air

 Trying to please me
 Making it easy
 It won't be there
 It won't be there
 In your life
 In your life

 There's a story I know
 We all leave and let go
 There is nothing to hold us

 In a moment of time
 When the fruit becomes wine
 And the thought becomes the memory

 All of your sorrow
 Maybe tomorrow
 Will fade away in the air

 Trying to please me
 Making it easy
 It won't be there
 It won't be there
 In your life
 In your life

 All of your sorrow
 Maybe tomorrow
 Will fade away in the air

 Trying to please me
 Making it easy
 It won't be there
 It won't be there
 In your life
 In your life
 In your life
 Oh, In your life


Leave a comment

Week fourteen of six

One of the inevitable facts of life is that home renovation projects take longer than anticipated. The company managing the renovation had estimated the work would take five to six weeks, but here we are in week fourteen and there’s another one, possibly two, weeks still to go.

The project was supposed to have started way back in autumn, but COVID-19 put a stop to that. Then it was to be a early June start, and finally got under way in the first week of July – mid winter! As part of the project involved adding a large skylight in the expanded upstairs bathroom at one end of the house, and a light tube into the dining room at the other end, some delays were inevitable due to inclement winter weather.

On top of that there’s a total of 6 rooms involved to varying degrees, and the project manager has to organise tradies from his own company and the subcontracting businesses. It’s quite surprising how many subcontractors are involved: scaffolders; electricians; plumbers; plasterers; painters; vinyl floorers; light tube installer; double glazing installer. It only takes one subcontractor to fall behind schedule for some reason to have a flow on effect. And there’s been one flow on effect after the other…

However, we can now see light at the end of the tunnel. We have a working loo upstairs and downstairs at last. This might not seem a big deal to some, but at our age traipsing downstairs to the loo at the opposite end of the house to answer a call of nature in the small hours, and then traipsing back upstairs is no longer the trivial pursuit it once was.

For myself, I loathe turning on lights during the night. I’m hypersensitive to sudden changes in illumination. The experience borders on painful – probably an autism trait. To lessen the discomfort, we have a nightlight in the hallway that provides a soft illumination when there’s no other source of light.

While that’s perfect for getting from the bedroom to toilet, once the toilet door is closed, the problem of lighting raises its head. This is especially an issue for us males as we’re required to aim throughout the performance, so lighting is essential. In the past, its been a matter of gritting my teeth and bracing for the discomfort before switching in the light.

No longer. The new loo has built in lighting “under the rim” which makes hitting the target a simple task. No need to switch on that ceiling light any more. And the wife appreciates the heated seat and integrated bidet.

When it comes to “toilet technology” this country trails way behind the gadetry that can be found in the wife’s homeland of Japan. When I first visited Japan in 1971, heated toilet seats and integrated bidets were quite common. Now it’s not uncommon to find such gadgets as automatically opening lids, automatically raising or lowering the seat depending on which way round you approach the bowl, ultraviolet sanitising, automatic flushing, and integrated bidets that not only wash the privates but also gently air dry afterwards.

When I last visited Japan a couple of years ago, I found myself counting the number of controls in toilets and trying to figure out what each one was for as many only had Japanese script, which I can’t read. Some even had touch screens that as well as providing all the controls for the toilet, seemed to have the functionality that a smartphone or iPad would be proud of!

One commonality that both Japan and Aotearoa share is that it is rare to find the toilet in the bathroom. It’s in a room all by itself. In this country it’s always the case if there’s a single toilet in a home. It’s bad enough having a single toilet for a whole household, but the mind boggles to think of the complications that must arise in a typical family household when washing and toileting share a common space.

And how can anyone enjoy a long luxurious soak in the bath knowing that at any time someone might have an urgent call of nature? It really doesn’t bear thinking about.

And while on the subject of toilets, what is it with American toilets? Most American toilet bowls contain enough water to float the Titanic in! It took me a long time to get over the fact that they weren’t blocked and about to overflow. Ours are “minimalist” when it come to water. as you can see from this snapshot of our new installation.

High tide line

There’s a little over 30 cm (12 inches) from the water line to the top of the bowl whereas in the US the waterline in some toilets was so high, one is in danger of dunking one’s undercarriage.

Our new toilets are somewhat more water efficient than our old ones, being dual flush,and using either 3 litres (0.66 gallons) or 4.5 litres (0.99 gallons). I know President Trump has issues with water efficient loos. Apparently he finds it necessary to flush them up to ten times after use. May I suggest, Mr President, that the problem isn’t the loo, it’s you. Get yourself sorted.

But back to the renovation project. The largest part involved expanding the bathroom on the upper floor into unused roof space so that we could install a decent sized bath. The old one was narrow not very deep and very short. It was impossible to immerse the entire body at once, and no way could the wife and I share a bath. So we overcompensated.

The new bath is a whopper, being 1795 mm (70.7 inches) long by 1050 mm (41.3 inches) wide by 490 mm (19.3 inches) deep and holds 275 litres (around 70 gallons). Plenty big enough for the two of us. We would have liked to have installed a Japanese style bath but they’re not readily available in this country and due to the quantity of water they hold, considerable strengthening of the floor joists would have been involved. As it was, it was necessary to fix steel plates to the joists underneath the new bath.

The new bathroom is divided into in two zones, somewhat similar to a typical Japanese bathroom. A dry area that contains the vanity units, storage units heated towel rails etc, and a wet area that contains the bath, shower, and body jets. The two zones are separated by a glass door and glass side panel on which is printed a photograph of a Japanese autumn scene.

And that glass door is the last of oh so many delays. The manufacturers mistakenly made the glass door and panel to standard door height specifications instead of the size of the opening between the two zones, which extends to ceiling height. So now they have to manufacture a new door and side panel and reprint the image onto the glass. It’s supposed to take up to ten working days to complete which means it won’t be ready until Wednesday next week.

And when this project is complete, we start planning for the next one, which is painting the exterior of the house. Due to the height of the building and steep pitch of the roof, health and safety regulations requires safety scaffolding to be used. Unfortunately as the scaffolding will exceed six metres (19.7 ft) in height, it must be installed by a certified scaffolder. It’s going to be expensive – very expensive, both to hire and install.

Some might argue that as only the wife and I occupy our very large (by NZ standards), multifloor home at the top of a steep hill, we would be better off moving into a smaller single floor dwelling on the flat, especially as we’re now in our seventies.

But we’ve grown into the space available and the incredible view eastwards over the town to the Tararua and Ruahine mountain ranges, and Manawatu Gorge in the distance is priceless. We’ve decided we’re staying until we’re carried out in a wooden box.


Leave a comment

And on the fourth week…

Kia ora e hoa

It’s getting difficult to remember when it was “normal” around here. I’m not referring to COVID-19. That returned to normal many weeks ago. In fact lockdown and its precautions are definitely a fading memory

No, the normal I’m referring to is the one we had prior to the commencement of bathroom renovations. Today marks the start of the fourth week of a major makeover of the upper floor toilet and bathroom including expansion into the roof cavity and the installation of a skylight, converting part of the roof cavity into a walk in wardrobe for the adjacent bedroom, the installation of a solar light tube to brighten up a dark corner of the dining room, the removal of two woodburners at opposite ends of the main floor that are too expensive to run and maintain, and the renovation of the toilet on the main floor.

Apart from weekends, the place has been a hive of activity with chippies, sparkies, plumbers and others constantly traversing between the basement garage and the upper floor via the main floor. Part of the basement has been taken over by storage of bathroom fixtures and part as a temporary workshop where larger equipment such as circular saws, framing jigs and whatnot have been set up. This way, most work can be carried out regardless of the weather.

The problem with this arrangement is that the garage doors and every door between the garage and the bathroom seem to be open more often than not. To make matters worse, for much of the last three weeks, the renovation area has been open to the uninsulated roof space. It’s the middle of winter here, and the stairwell extending over the three floors has been acting as a funnel drawing all the heat generated on the main floor up to the top floor and out into the roof space. In the process it draws cold air from the basement and distributes it across the main floor.

The airflow from basement to roof space has been exacerbated over the past ten days by strong easterly winds that rush through the open garage doors and create a hurricane-like gale up the stairwell. I’ve taken to switching off the heatpump when the first of the workers arrives at around 7:30 in the morning and not turning it back on until the last of them leaves when it starts to get dark at around 5:00 as its heat output, even on maximum is miniscule compared to the draught up the stairwell. Effectively, all the heat generated was being transferred outside. Let’s just say it’s been decidedly chilly over the last few weeks.

Thankfully the builders have almost finished their work on the upper floor bathroom/toilet renovation – The only major task remaining is the installation of the skylight. Weather permitting, that should all be done by tommorrow. After that, it should be much quieter for a while as the plumbers, sparkies, floorers and such finish off their work.

It never occurred to me to take some “before” photos of the project, so although I have captured a few at major milestones since, you’re all spared a series of photo blogs of “work in progress”. I’ve also realised that the phone camera is not up to the task of recording the work. Bathrooms are relatively small and unless the camera has a wide angle mode, which mine doesn’t, it’s not possible to capture more than a small section of wall/floor/ceiling at a time. I suppose it might be possible to use panorama mode to create a better field of view, but it’s not something I’ve experimented with. Perhaps a video clip that pans around the room might be another option.

My home office is almost directly below the upper floor bathroom and at this point in time the noise is becoming decidedly unpleasant. I’m not sure what they’re doing, but the sound that is emanating from above reminds me very much of a dentist’s drill. So I think it’s time to withdraw and find a quite corner in which to hole up. So for now, ka kite anō.